188bet login

National Urban Rail Transit Equipment 188bet online live casino Line

Release time: 2019-01-03 [Font:Big small

  2002According to the "Approval of the Feasibility Study Report on the Subway Train Construction Project with Independent Intellectual Property Rights" by the former State Planning Commission (Planning IndustryChina Academy of Railway Sciences Group Co., Ltd. has implemented an urban rail vehicle 188bet online live casino supporting renovation project at the circular railway 188bet online live casino base

An urban rail transit equipment 188bet online live casino line with comprehensive testing capabilities and world-class level has been built

258.6km, maximum 188bet online live casino speed140km/h. Equipped across the board300m600m1200mThe sum of curves with different radii10%25‰,35‰Ramp with constant slope and a radius of110mand150mBasically covers all the extreme working conditions of the actual operating line5000kmAdjustment of the 188bet online live casino "Rules for Post-assembly Inspection and Testing of Urban Rail Vehicles" (GB/T14894)》Requirements for various vehicle 188bet online live casino projects.  

Track damping structure installed on the viaduct

Track damping structure set on a straight line segment

U-shaped beam on the portal pier

New tunnel

New traction substation

Noise standard 188bet online live casino section

Signal and information system infrastructure platform1 communication signal system control centerCBTCProvides a 188bet online live casino platform for various majors to carry out scientific research on new products and new technologies

The urban rail transit 188bet online live casino line has advanced 188bet online live casino equipment and complete 188bet online live casino conditions

Attachment:
Back to top