188bet mobile login

China Economic Net: 188bet mobile login to Nyingchi Railway opened for operation on June 25

Release 188bet mobile login: 2021-06-25 [Font:Big small

China Economic Network, Beijing, June 24th China State Railway Group Co., Ltd. released news,The 188bet mobile login to Nyingchi Railway (hereinafter referred to as the 188bet mobile login-Ningchi Railway) will be opened for operation on June 25,The Fuxing plateau internal power dual-source EMU is put into operation simultaneously,188bet mobile login to Shannan、The fastest in Linzhi is 1 hour and 10 minutes、3 hours and 29 minutes away。
According to introduction,The Lalin Railway starts from 188bet mobile login City, Tibet Autonomous Region,via Gongga County, Shannan City、Zhanang County、Naidong District、Sangri County、Jiacha County and Lang County, Linzhi City、Milin County,Arrived in Linzhi city,Full length 435.48 kilometers,Design speed 160 kilometers per hour,It is a national Class I single-track electrified railway,Gongga, which initially opened operations for passenger and cargo transportation services、Zha Nang、Shannan、Sangri、Add Cha、Lang County、Milin、Ganga、9 stations in Linzhi。
The Lalin Railway is located in the southeastern Tibet valley between the Gangdise Mountains and the Himalayas on the Qinghai-Tibet Plateau,More than 90% of the lines are above 3000 meters above sea level,Crossed the Brahmaputra River 16 times,High mountains and deep valleys along the line,The relative height difference is 2500 meters,Extremely difficult construction。Since construction started in March 2015,All participating units integrate and use my country’s practical experience in railway construction,Concentrate your efforts on the "strong rock burst、High temperature、Moraine layer、Wind-accumulated sand、To tackle key engineering problems such as "large deformation",47 tunnels have been built safely and with high quality、121 bridges,There is the Bayu Tunnel with the largest depth in 188bet mobile login、Sangzhuling Tunnel with high temperature and high altitude、The world’s largest long-span Zangmu Yarlung Zangbo River Bridge。
Lalin 188bet mobile login is under construction,Giving full play to the demonstration and leading role of scientific and technological innovation,Effectively improve the first-time success rate of the project,Protected the ecological environment along the route,A number of modern landmark buildings with distinctive humanistic characteristics have been formed,At the same time, a number of permanent roads were built、Bridge,Driving the development of local industries and the prosperity of people of all ethnic groups。
To adapt to the environmental conditions of Lalin Railway Plateau 188bet mobile login,The railway department has strengthened the prevention and control measures of geological disasters along the line,Established a monitoring and alarm system,Improved the implementation of emergency plans and disposal mechanisms,Comprehensively improved response to various complex and disastrous climates、The ability to operate safely。
Before operation,Related units organized by 188bet mobile login Railway Group,Strict regulations and standards,Conducted inspection, acceptance and safety assessment on various professional equipment of Lalin Railway,To track status、Paint and catenary performance、Train Control、The communication signal system has been comprehensively optimized,Satisfied railway safety、Stable operation requirements,Currently, the conditions for operation are met。
Initial operation,The railway department arranges to run 3 pairs of D trains from 188bet mobile login to Nyingchi,2 of them are operated during peak passenger flow period;1 pair of D trains from Shigatse to Linzhi;1 pair of direct express trains from 188bet mobile login to Nyingchi。
188bet mobile login Railway Group takes the lead in organizing domestic rolling stock scientific research and equipment manufacturing enterprises to form an innovation consortium,Successfully developed the Fuxing plateau internal power dual-source EMU,It will be put into operation simultaneously when the Lalin Railway is opened,Historically achieved full coverage of Fuxinghao in 31 provinces, autonomous regions and municipalities。This EMU adopts an integrated train design,Hang electric powered vehicles and internal combustion powered vehicles at both ends respectively,Can switch freely between electrified and non-electrified lines、Comprehensive use,Grouped into 12 vehicles,Set first class、Second Class and Business Class,Capacity 755 people,Innovation uses a combination of dispersion and distribution to continuously supply oxygen,Provide passengers with a good ride experience,Completely adapted to high altitude、Continuously long tunnel environment。
The completion and opening of the Lalin Railway,Ending the history of no railways in southeastern Tibet,It makes up for the shortcomings of existing transportation methods that are easily affected by the plateau climate,Further improving the regional comprehensive transportation system,Improved the stability and accessibility of transportation,Realized people’s dream of “getting on the train to 188bet mobile login”。
The Lalin 188bet mobile login connects the existing Lashi and Qinghai-Tibet Railways,It is also an important part of the Sichuan-Tibet 188bet mobile login under construction、The planned common line section of the Yunnan-Tibet 188bet mobile login,Its completion and opening to traffic are of very important significance。
Attachment:
Back to top