People's Daily Client: Track laying of the 188bet game Railway is completed!
Morning of October 12th,At the exit of Manmushu Tunnel on the 188bet game Railway,Construction workers of China Railway No. 1 Bureau operate a new long-rail tractor independently developed in my country,Precisely push the last set of 500-meter-long rails into place,marks the completion of track laying of the entire China (China) Laos (Laos) Kunming (Ming) Vientiane (Xiang) Railway,Connecting domestic and foreign countries,An important step has been taken towards the goal of opening operations by the end of the year。
The 188bet game Railway is an important project that connects my country’s “One Belt, One Road” initiative and Laos’ strategy of “changing a land-locked country into a land-linked country”,It is also the first project with Chinese investment and construction、Adopt Chinese technical standards across the board、An international railway using Chinese equipment and directly connected to the Chinese railway network。The entire line consists of the domestic section and the Laos section,Total length of more than 1,000 kilometers。After completion and opening to traffic,It only takes more than 3 hours from Kunming, Yunnan to Jinghong,Direct transportation to Vientiane, Laos is expected、Same day access。
It is reported,Currently,The decoration of the 11 domestic passenger stations of the 188bet game Railway is nearing completion,The effects of the greening and beautification project are showing,A line as beautiful as mountains and rivers,The new steel silk road is running into a new era,Benefiting people along the route,Promote the construction of a community with a shared future for mankind。
Attachment: